Monday 21 October 2013

Neighbours started / Shelter Finished

Recently visited our block and can see our neighbours and surrounding lots' frames are all going up.




Good to see our estates infrastructure is moving along nicely as the shelter at the end of our drive is finished.




Preliminary Contract and Colour Selection

On the 11th October we signed the Preliminary Contract and finalised any structural changes:
- Cavity slider door to ensuite
- 2 awning windows 610mm wide to back of family room
- Extend ensuite vanity by 500mm
- Fly Screen door to sliding door of family room
- Eves to the front of the house excluding the garage
- Alugard security screen door to front entry


On the 16th October we had our colour selection appointment. See photos of selections below:

Bricks: Selkirk Moonshadow


House with the same Bricks:



Colorbond Roof: Monument
Gutter, Facia, Downpipes, Garage Door: Dune
Render: Dreyfus
Front Door: Aumbry
Window Frames: Satin Black




Timber Floors (Entrance/Kitchen/Family): Blackwood



Wall paint: whisper white
Carpet (Sitting/Bedrooms): Dark Night



Bathroom/Ensuite Floor Tile: City Grey Gloss



Bathroom/Ensuite/Kitchen Plash-back Tile: Gloss Stone




Blinds: Charcoal



Coloured Concrete Driveway: Charcoal (without pattern)



Ensuite/Bathroom: 
Antarctic Stone Diamond Gloss Benchtop
Straight Grain Wenge Cupboards




Kitchen:
Top Cupboards -  Deep Anthracite
Squareform Benchtop - Ebony Marble
Bottom Cupboards - Mist Grey
Kick-boards - New Stainless Steel 

Builder and Home Chosen

Late July 2013 we chose to build the "Delta 22" with Metricon.

We chose to have the "Neo" Facade and will add render to the brickwork around the double front window:



We changed the 4th bedroom into an outdoor alfresco room.

Floorplan:

Land

In July 2013 we chose land in the Berwick Waters Estate. Signed the Contract on 17/8/13


Click the link below to check out the Video:

Berwick Waters Website